Each Delta IV rocket is assembled horizontally, erected vertically on the launch pad, integrated with its satellite payload, fueled and launched. This process reduces on-pad time to less than 10 days and the amount of time a vehicle is at the launch site to less than 30 days upon arrival from the factory. This reduces costs associated with launch site operations and increases customer schedule flexibility.